Caring for New Asphalt During the First Year
The first 72 hours
Keep all traffic off for at least 24 hours, longer in hot weather. Asphalt cools to walkable quickly but stays soft under vehicle weight.
The first 30 days
Don't park in the same spot repeatedly, avoid turning the steering wheel while stopped, and keep motorcycle and trailer jack stands off the surface without a plywood pad underneath.
The first summer
On very hot days new asphalt will soften slightly. That's normal and it re-hardens overnight. Just be mindful of point loads.
Edges
The outside edges are the most vulnerable part of any driveway. Backfill them with topsoil and grass, and keep heavy vehicles from riding over them.
First sealcoat
Wait 6 to 12 months. Sealing a fresh mat too early does more harm than good.
Need a professional opinion on your pavement?
We give free, no-pressure assessments across Memphis and Shelby County.
Call 901-617-3733 Request a QuoteMore guides
- How Long Does an Asphalt Driveway Last in Tennessee?
- Asphalt vs. Concrete Driveways: An Honest Comparison
- When Should You Sealcoat a Driveway or Parking Lot?
- 7 Signs Your Asphalt Needs Repaving, Not Patching
- What Actually Drives Asphalt Driveway Cost
- Building a 5-Year Parking Lot Maintenance Plan
- Why Drainage Decides How Long Your Pavement Lasts
- Potholes: Why They Form and How They Should Be Fixed
- Asphalt Thickness and Base Depth: A Practical Guide